There has been a huge improvement with our area extension at the back and side of the house. Last year, only less than half of it was done. It took a while for us to wait for the roof delivery as there was a delay in the shipment according to our contractor. Well, we always give allowances for cases of delays, hassles, etc...but so far, no major hassles or so.
With all the tiling, roofing and putting some steel bars (door grills for security) at the back to the other side of the house, it is indeed so pleasant and a more convenient feeling to see the area much better...a lot more space to move around and place some stuff.
There is also an additional sink installed, plus two more faucets added for the washer and the sink.
Door grills and an open window with steel bars were also installed at the back and front.
Our back up generator (in case of brown outs) was finally installed on its throne, LOL! The stand is slightly elevated with the generator tightly screwed on it.
With all the tiling, roofing and putting some steel bars (door grills for security) at the back to the other side of the house, it is indeed so pleasant and a more convenient feeling to see the area much better...a lot more space to move around and place some stuff.
There is also an additional sink installed, plus two more faucets added for the washer and the sink.
Door grills and an open window with steel bars were also installed at the back and front.
Our back up generator (in case of brown outs) was finally installed on its throne, LOL! The stand is slightly elevated with the generator tightly screwed on it.